Basic Info.
Output Type
AC Three Phase
Type
Vertical Hydro Generator
Bearing Support
Hanging Type
Discharge
9.61-14.98 M3/S
Regulation Work
3000-5000kgm
Product Description
Kaplan Turbine
Axial flow turbine is used in the condition with low head which is between 3m and 40m and MID-large flow. It is vertical type with concrete spiral case or metal spiral case and it could be regulated blade runner and fixed blade runner. Fixed blade turbine is used in the hydropower plant whose head rangeability, is not large. And it has compact structure and will reduce the investment. Regulated blade turbine is used in the hydropower plant whose head rangeability is large. And it has complex structure .However the high effective operation zone is large and with high average efficiency. We can provide you all kinds of the kaplan turbine whose runner diameter is between 0.8m and 4.5m and output is lower than 50MW.
Turbine | Governor | Transmission |
|
Type | Head(m) | Discharge (m3/s) | Speed (rpm) | Power (kW) | Regulation Work (kgm) |
|
|
Y130 | | | | | | |
ZDY130-LH-160 | ≤22 | 6.63-19.7 | 250-375 | 533-3341 | 1000-3500 | Directly coupling |
ZDY130-LH-180 | ≤22 | 8.26-24.6 | 214.3-333.3 | 664-4173 | 1000-5000 | Directly coupling |
ZDY130-LH-200 | ≤22 | 10.5-30.7 | 187.5-300 | 848-5236 | 1800-6000 | Directly coupling |
ZDY130-LH-225 | ≤22 | 13.8-38.7 | 187.5-272.7 | 1072-6600 | 3000-6500 | Directly coupling |
ZDY130-LH-250 | ≤22 | 16.6-48.9 | 166.7-250 | 1334-8340 | 3000-11000 | Directly coupling |
ZDY130-LH-275 | ≤22 | 20.9-61.1 | 150-250 | 1688-10420 | 3500-14000 | Directly coupling |
ZDY130-LH-300 | ≤22 | 26.1-70.3 | 150-214.3 | 2108-11989 | 4500-16000 | Directly coupling |
ZDY130-LH-350 | ≤22 | 41.7-76.4 | 115.4-166.7 | 3387-13101 | 7000-20000 | Directly coupling |
ZDY130-LH-380 | ≤22 | 51.6-97.8 | 115.4-166.7 | 4191-16771 | 10000-25000 | Directly coupling |
ZDY130-LH-410 | ≤22 | 64.5-122.2 | 107.1-150 | 5239-20955 | 12000-33000 | Directly coupling |
ZDY130-LH-450 | ≤22 | 82.1-152.7 | 100-136.4 | 6669-26185 | 16000-43000 | Directly coupling |
Y120 | | | | | | |
ZDY120-LH-160 | ≤40 | 10.4-26.1 | 375-500 | 1820-8434 | 1800-6000 | Directly coupling |
ZDY120-LH-180 | ≤40 | 13.1-33.6 | 333.3-500 | 2234-10498 | 3000-8000 | Directly coupling |
ZDY120-LH-200 | ≤40 | 15.5-40.6 | 272.7-428.6 | 2658-13048 | 3000-11000 | Directly coupling |
ZDY120-LH-225 | ≤40 | 19.8-51.9 | 250-375 | 3377-16679 | 4000-14000 | Directly coupling |
ZDY120-LH-250 | ≤40 | 24.7-64.9 | 214.3-333.3 | 4213-20972 | 5500-20000 | Directly coupling |
ZDY120-LH-275 | ≤40 | 30.9-80.6 | 214.3-333.3 | 5270-26045 | 7000-25000 | Directly coupling |
ZDY120-LH-300 | ≤40 | 38.9-96.8 | 187.5-300 | 6670-31280 | 9000-31000 | Directly coupling |
ZDY120-LH-350 | ≤40 | 49.4-129.0 | 166.7-250 | 8471-41685 | 12000-45000 | Directly coupling |
ZDY120-LH-380 | ≤40 | 61.8-148.3 | 150-214.3 | 10597-48184 | 16000-52000 | Directly coupling |
ZDY120-LH-410 | ≤40 | 76.0-161.2 | 136.4-187.5 | 13103-52375 | 20000-60000 | Directly coupling |
ZDY120-LH-450 | ≤40 | 97.2-203.1 | 125-187.5 | 16758-66347 | 28000-78000 | Directly coupling |
T03 | | | | | | |
ZDT03-LH-160 | 3.0-8 | 7-13.1 | 214.3-300 | 281-709 | 600-1000 | Speed increase or Directly coupling |
ZDT03-LH-180 | 3.0-8 | 9.58-16.2 | 9.58-16.2 | 214.3-300 | 1000-1800 | Directly coupling |
ZDT03-LH-200 | 3.0-8 | 11.5-19.5 | 166.6-250 | 451-1096 | 1000-1800 | Directly coupling |
ZDT03-LH-225 | 3.0-8 | 14.2-28 | 166.6-250 | 546-1793 | 1500-3000 | Directly coupling |
ZDT03-LH-250 | 3.0-8 | 16.8-41 | 100-214.3 | 696-2690 | 1800-5000 | Directly coupling |
ZDT03-LH-275 | 3.0-8 | 19.2-49.7 | 100-200 | 882-3255 | 2000-6000 | Directly coupling |
ZDT03-LH-300 | 3.0-8 | 23.6-59.2 | 93-187.5 | 1106-3874 | 3000-8000 | Directly coupling |
JP502 | | | | | | |
ZDJP502-LH-120 | 8.0-30 | 6.3-12.7 | 300-600 | 885-2660 | 1000-1800 | Directly coupling |
ZDJP502-LH-140 | 8.0-30 | 8.6-17.3 | 272.7-500 | 1204-3622 | 1000-3000 | Directly coupling |
ZDJP502-LH-160 | 8.0-30 | 11.3-22.6 | 250-428.6 | 1573-4730 | 1800-4000 | Directly coupling |
ZDJP502-LH-180 | 8.0-30 | 14.3-28.6 | 200-375 | 1990-5986 | 2000-5000 | Directly coupling |
ZDJP502-LH-200 | 8.0-30 | 17.6-35.3 | 200-333.3 | 2458-7391 | 3000-6000 | Directly coupling |
ZDJP502-LH-225 | 8.0-30 | 22.3-44.7 | 166.6-300 | 3111-9354 | 4000-8000 | Directly coupling |
ZDJP502-LH-250 | 8.0-30 | 27.5-55.1 | 150-272.7 | 3841-11549 | 5000-11000 | Directly coupling |
ZDJP502-LH-275 | 8.0-30 | 33.3-66.7 | 136.4-250 | 4648-13974 | 6500-14000 | Directly coupling |
Company
Our company is an experienced manufacture and engineering Company in small scale hydro power equipment ( 100Kw to 50Mw). We play the role of manufacture and EPC contractor and could supply water to wire equipments and services. As turbine manufacture more than 60 years experience.
Our factory occupies 200,000 square meters of land, which includes 9 workshops, over 120 sets of heavy and precision producing and testing machinery; scientific research development center in the southern China, and various testing facilities. We have a general technical staff of 320 and 85 senior technical professionals.
We provide customers with the complete package, from the design and manufacture of the turbine, generator and control equipment through to installation, commissioning and ongoing repair and maintenance.
1.Water Turbine Generator Unit Design & SUPPLY
2.Hydropower equipment supply
3.Feasibility study of hydropower project
4.Manufacture
5.Installation & Supervision
6.Commissioning and Training service
7. Hydro power plant rehabilitant
8. Hydro power plant spares supply
9.Services
Our Services
Usually we guide the installation. We will dispatch engineers to site.(electrical engineer, mechanical engineer, control engineer and a translator according to requirement)
1.Water head:___M
2.Water flow:____M3/s
3.Frequency: 50HZ/60HZ
4.Generator outgoing line voltage:__Kv
5.On-grid or Off-grid type? (On-grid type voltage:____Kv)
Experience List (Part)
No. | Name of Projects | Turbine Type | Capacity | Year | Generator model |
1 | Yangjiahe first stage hydropower station in Taohe , Gansu province | ZZY130-LH-360 | 3×12500KW | 2007 | SF12.5-36/5700 |
2 | Shangchuan hydropower co.,ltd.in lintan county | ZD02-LH-340 ZT02-LH-280 | 2×4500KW 4×3000KW | 2009 | SF4500-40/4250 SF3000-32/3250 |
3 | Wudu Dayuanba hydropower station in Longnan county | ZZHT160-LH-330 | 3×12000KW | 2013 | SF12000-32/5100 |
4 | Bailong river Jinpin hydropower station project in Longnan,Gansu province | ZZHT160-LH-330 | 3×8000KW | 2014 | SF8000-36/4900 |
5 | Dongmei hydropower station project in Quanzhou,Fujian province | ZT02-LH-295 | 1×2000KW | 2012 | SF2000-20/4250 |
6 | Runqiu second stage hydropower station in lingtao,Gansu province | ZD660-LH-295 | 2×4500KW | 2008 | SF4500-36/3850 |
7 | Taijiang Xiaohe hydropower station in Guizhou province | ZD02-LH-260 ZT02-LH-260 | 2×1000KW 1×1000KW | 2012 | SF1000-44/3250 |
8 | Ruilong hydropower station in Gansu province | ZD660-LH-250 | 3×3200KW | 2008 | SF3200-32/3250 |
9 | Sanlan Hezha hydropower station in Jieyang city,Guangdong province | ZDY269-WZ-240 | 4×630KW | 2008 | SFW630-44/2150 |
10 | Ruidi Second stage hydropower station in Lintao county,Gansu province | ZD660-LH-235 | 1×2500KW | 2008 | SF2500-28/3250 |
11 | Xinzhong hydropower station in Lintao county,Gansu province | ZD660-LH-225 | 3×2200KW | 2007 | SF2200-24/2860 |
12 | Tinghui hydropower Co.,LTD in Shanghang county,Fujian province | ZDT03-LH-225 | 3×800KW | 2006 | SF800-36/2600 |
13 | Xishan hydropower station in Yichun city Heilongjiang province | ZZ550-LJ-203 | 2×5000KW | 2007 | SF5000-18/2860 |
14 | Hongze hydropower station in the south-to-north water diversion project | ZDT03-LH-200 | 2×500KW | 2011 | SF500-36/2600 |
15 | Lagong hydropower station in Yushu city,Qinhai province | ZDJP502-LH-200 | 1×2000KW | 2008 | SF2000-24/2600 |
16 | Lagong hydropower station in Yushu city,Qinhai province | ZDJP502-LH-200 | 4×2000KW | 2005 | SF2000-24/2600 |
17 | Huifeng hydropower Co.,LTD in Fujian province | ZDJP502-LH-200 | 2×1600KW | 2004 | SF1600-28/2600 |
18 | Longqinxia hydropower station in Yushu city,Qinhai province | ZDJP502-LH-180 | 2×1250KW | 2004 | altitude4100 |
19 | Ouguo hydropower station in Ali area,Xizang Province | ZDJP502-LH-180 | 2×2000KW | 2003 | altitude4700 |
20 | Jiaoxi hydropower development Co.,LTD in Taining county ,Fujian province | ZD560a-LH-180 | 3×1600KW | 1996 | Straight league |
21 | Yanhe hydropower station in Huaiyin county ,Jiangsu province | ZDJP502-LH-180 | 3×1250KW | 1994 | Straight league |
22 | Zhuma hydropower station in Lianshui city,Jiangsu province | ZD592-LH-180 | 2×630KW | 1990 | speed up |
23 | Meishan hydropower station in Longyan city | ZZJP502-LH-160 | 3×2000KW | 2014 | |
24 | Kuanpin Second stage hydropower station in Shangluo city,Shanxi province | ZDJP502-LH-160 HLA551C-LJ-145 | 2×2500KW 1×1600KW | 2012 | Straight league |
25 | Funing and Xiaozhongzha hydropower station in South-to-North Water Diversion Project | GDB-WS-160 ZDT03-LM-100 | 7×250KW 1×100KW | 2011 | SFW200-6/740 SF100-6/560 |
26 | Kuanpin(first-stage) hydropower station in Shangluo city,Shanxi province | ZDY130-LH-160 ZDY130-LH-110 | 2×2000KW 1×800KW | 2011 | Straight league |
27 | Water conservancy administration in Zhucheng city | ZDT03-LH-160 | 3×400KW | 2007 | Straight league |
28 | Huzhu hydropower station in Qinhai province | ZD560a-LH-160 | 3×1250KW | 2004 | altitude2200 |
29 | Changquan electricity Co.,LTD in Yangquan city,Fujian province | ZDJP502-LH-160 | 3×1000KW | 2005 | Straight league |
30 | Water conservancy administration in Zhucheng city | ZDT03-LH-140 | 3×400KW | 2006 | Straight league |
31 | Yinlong hydropower station Co.,LTD in Lintao county ,Gansu province | ZDT03-LH-140 | 3×400KW | 2004 | altitude1900 |
32 | Daozhi hydropower station in Wuzhishan city,Hainan province | ZD660-LH-135 ZT660-LH-135 | 2×800KW 1×800KW | 2015 | |
33 | Yundong hydropower station upgrading project of the management office of the total irrigation canal in Jiangsu province | ZDHZD01-LM-120 | 10×125KW | 2013 | Straight league |
34 | Shouxian xiangjiaooba project in Pizhou city | ZD660-LH-120 | 4×160KW | 2013 | Straight league |
35 | Lishuya hydropower station in ninqiang county,Shanxi province | ZDJP502-LH-120 | 3×2000KW | 2012 | Straight league |
36 | Qushou hydropower station in Hutubi county,Xinjiang province | ZDJP502-LH-120 | 3×1500KW | 2010 | Straight league |
37 | Mishan hydropower station in Wendeng city | ZD660-LH-120 | 3×500KW | 2010 | Straight league |
38 | Hongxin hydropower station in Lintao city,Gansu province | ZD560a-LH-120 | 3×500KW | 2005 | altitude1900 |
39 | Nieka second-stage hydropower station in Yushu city,Qinhai province | ZDJP502-LH-120 | 3×500KW | 2005 | altitude4100 |
40 | Kondao hydropower station in Vietnam | ZD560a-LH-120 | 3×500KW | 2005 | altitude1900 |
41 | regulator valve reinforcement project in Siyang city | ZDT03-LJ-100 | 2×160KW | 2013 | speed up |
42 | LinKai hydropower vinceCo.,LTD in Lintao city,Gansu pr | ZDJP502-LH-100 | 2×400KW | 2005 | altitude1900 |
43 | Shancheng hydropower station in Huangyuan county,Qinhai province | ZDJP502-LH-100 | 2×630KW | 2007 | altitude2500 |
44 | Gaoya reservoir reinforcement project in Changle city Shandong province | ZDT03-LH-80 | 3×200KW | 2005 | Straight league |
Jiangsu Aerospace Hydraulic Equipments Co.,Ltd(JAHEC)
ADD:No.8 Bosideng Ave. Gaoyou, Jiangsu Province P.R.C.
TEL/FAX:+86 514-80955126
HTTP//:aerospace.en.made-in-china.com
WELCOME TO OUR COMPANY AND VISIT!
Address:
8 Bosideng Ave, Yangzhou, Jiangsu, China
Business Type:
Manufacturer/Factory
Business Range:
Industrial Equipment & Components, Manufacturing & Processing Machinery, Security & Protection, Service, Tools & Hardware, Transportation
Management System Certification:
ISO 9001, ISO 14001, OHSAS/ OHSMS 18001
Company Introduction:
Jiangsu Aerospace Hydraulic Equipments Co., Ltd. (formerly State-owned Gaoyou Water Pump Factory), a state grade II enterprise and the state high-tech enterprise, is the professional manufacturer of large-scale water pump and hydro turbine unit, designated by the former ministry of machinery industry; And a key enterprise of Jiangsu province machinery industry. Now it becomes the enterprise under the No. 6 Institute of China Aerospace Science and Technology Group, with strong supports of the application technology of aerospace fluid technology and materials. Our company is the domestic large production base with the first class comprehensive ability for design and manufacturing of medium and large pump, hydro-equipments.
The main products of the company: Medium-sized and large series axial flow pump and mixed flow pump (full adjustable, semi-regulation); Medium and large series of axial flow, mixed flow, tubular Hydro Generating Units; Open series centrifugal pump, mixed flow pump, the mobile pumping station and other industrial, municipal pumps.
The company covers an area of 20 hectares, has the modern industrial workshops of 45, 000 square meters, equipped with large-scale manufacturing and CNC processing center at the leading position among the same field in China. The Company has Hydraulic Machinery Research Institute and the hydraulic test center, for research and developing on high quality complete sets of hydraulic machinery. The quality system passed the ISO9002 international quality certification. The company has is qualified of import and export business. Large scale pump and turbine generator units, has received the awards of the National Science Conference, the pump research award of the National South-North Water Diversion Project, and national and provincial science and technology progress awards.
The company is located in Economic Development Zone of Gaoyou City, Jiangsu Province, China, close to the Beijing-Shanghai Expressway, Beijing- Shanghai High-speed Railway, Yangzhou Airports, the traffic is convenient. Warmly welcome friends from home and abroad to visit and instruct us.